House of Representatives
पूर्वाधार विकास समिति
Committee assignments appear exactly as listed on members’ official profiles in the Federal Parliament directory on the date shown. Only members whose assignments are published here are counted, so these lists may be incomplete and are not the full size of each committee. A missing name means “not yet verified here”.
Infrastructure Development Committee
What does this committee do?
Under rule 173 of the House of Representatives Rules, 2083: (a) Ministry of Infrastructure Development; (b) Ministry of Energy, Water Resources and Irrigation.प्रतिनिधि सभा नियमावली, २०८३ को नियम १७३ बमोजिमः क) पूर्वाधार विकास मन्त्रालय ख) ऊर्जा, जलस्रोत तथा सिँचाई मन्त्रालय
English: our translationFederal Parliament of Nepalसङ्घीय संसद् Committee page, "कार्यक्षेत्र" (Mandate & Scope) section. The English locale shows the same Nepali text.Recent agenda
An agenda lists planned business. It does not establish what was decided or whether a proposed appointment was approved.
- २०८३ आश्विन १२ · पूर्वाधार विकास समिति - बैठक १४
Making passenger travel easy, safe and orderly during Dashain, Tihar, Chhath and other festivals of 2083 BSवि.स. २०८३ सालको दशैँ, तिहार, छठ लगायतका चाडपर्वमा यात्रु आवागमन सहज, सुरक्षित र व्यवस्थित बनाउने सम्बन्धमा
Source checked
Federal Parliament of Nepalसङ्घीय संसद् · Federal Parliament of Nepalसङ्घीय संसद् - २०८३ आश्विन ५ · पूर्वाधार विकास समिति - बैठक १३
Damage to life and infrastructure, rehabilitation and reconstruction in the flood- and landslide-affected districts (Rasuwa, Nuwakot, Dhading)बाढी तथा पहिरो प्रभावित जिल्लाहरु ( रसुवा, नुवाकोट, धादिङ) मा जनजीवन र पूर्वाधारमा परेको क्षति, पुनर्स्थापना तथा पुनर्निर्माणका सम्बन्धमा
Source checked
Federal Parliament of Nepalसङ्घीय संसद् · Federal Parliament of Nepalसङ्घीय संसद् - २०८३ आश्विन ५ · पूर्वाधार विकास समिति - बैठक १३
Arranging the investment needed for reconstructionपुनर्निर्माणको लागि आवश्यक लगानी व्यवस्थापन सम्बन्धमा
Source checked
Federal Parliament of Nepalसङ्घीय संसद् · Federal Parliament of Nepalसङ्घीय संसद् - २०८३ भाद्र १८ · पूर्वाधार विकास समिति - बैठक १२
Natural disasters and their effect on infrastructureप्राकृतिक प्रकोप र यसले पूर्वाधार क्षेत्रमा पूर्याएको असर सम्बन्धमा
Source checked
Federal Parliament of Nepalसङ्घीय संसद् · Federal Parliament of Nepalसङ्घीय संसद्
Prepare for this committee
Background from official sources, checked on: 2026-10-12 · Official parliament pages (digital.parliament.gov.np committee and meeting pages; hr.parliament.gov.np and na.parliament.gov.np committee notices) read 2026-10-12, 02:35-03:10 UTC (2083 Asoj 26, morning, Nepal time). Rules: HoR Rules 2083 (first edition, 2083 Jestha), NA Rules 2075 consolidated to the second amendment, Joint Rules 2080. Evidence: Budget Statement FY 2083/84 (Annex 4); Auditor General 63rd annual report summary (2083) and 62nd annual report (2082); Economic Survey 2025/26 (May 2026); High-Level Economic Reform Commission report (2081 Chaitra); NDRRMA Rasuwa-Bhotekoshi RDNA (September 2026).. Neutral and nonpartisan; it does not tell anyone how to vote.
What does it cover?
- Rule 173 of the House of Representatives Rules, 2083 sets up this committee, like the other nine thematic committees, to make the Government of Nepal responsible and accountable to the House and to monitor and evaluate its work and give directions or advice. Its jurisdiction: the Ministry of Infrastructure Development; the Ministry of Energy, Water Resources and Irrigation; and related subjects and bodies. Federal Parliament Secretariatसङ्घीय संसद् सचिवालय · Federal Parliament of Nepalसङ्घीय संसद् HoR Rules 2083, rule 173 table, printed pp. 89-91 (PDF pp. 103-105); the portal committee page "कार्यक्षेत्र" section gives the same list.
- Under rule 178(1), a thematic committee can also, among other things: examine the revenue and expenditure estimates of the bodies it covers and suggest savings; follow up ministers' commitments and assurances; check whether delegated legislation stays within its parent Act; follow up inquiry-commission reports; hear admissible complaints from the public; measure implementation of laws; review the work of constitutional commissions in its area; and receive, within 30 days, a progress report on the directions it gives. Federal Parliament Secretariatसङ्घीय संसद् सचिवालय HoR Rules 2083, rule 178(1)(ग)-(ठ), printed pp. 96-97 (PDF pp. 110-111).
Recent and upcoming business
- १२ आश्विन २०८३ (2026-09-28) Infrastructure Development Committee, meeting 14
Making passenger travel easy, safe and orderly during Dashain, Tihar, Chhath and other festivals of 2083 BSSource checked
Summary of published minutes: The published minutes record directions to run enough vehicles from designated bus parks with ticket sales at set points; to assess road risks, prepare alternative routes, test vehicles and ensure driver rest and speed control; to stop overloading; and for the Ministry of Infrastructure Development to prepare and implement an immediate action plan on tickets, fares and grievance handling.
Official record - ५ आश्विन २०८३ (2026-09-21) Infrastructure Development Committee, meeting 13
Damage to life and infrastructure, rehabilitation and reconstruction in the flood- and landslide-affected districts (Rasuwa, Nuwakot, Dhading)Source checked
Summary of published minutes: The published minutes record that the Ministry of Infrastructure Development is to prepare an accurate damage record and a reconstruction plan within one month for discussion at a later committee meeting; that budget and coordination across federal, provincial and local governments be ensured; that the ministry carry out procurement and construction through the e-GP system from 2083 Kartik 1; and that a subcommittee be formed on festival public transport.
Official record - ५ आश्विन २०८३ (2026-09-21) Infrastructure Development Committee, meeting 13
Arranging the investment needed for reconstructionSource checked
Official record - १८ भाद्र २०८३ Infrastructure Development Committee, meeting 12
Natural disasters and their effect on infrastructureSource checked
Official record - ८ भाद्र २०८३ Infrastructure Development Committee, meeting 11
Infrastructure development and public-private partnershipSource checked
Summary of published minutes: The published minutes record requests for written views from business federations within 15 days; for the Investment Board to report within 15 days on the status of PPP hydropower and waste-management projects and their delivery problems; and for suggestions on reforming the Investment Board law and the Board's role.
Official record - ४ भाद्र २०८३ Infrastructure Development Committee, meeting 10
The Bagmati Beautification Project under the High Powered Committee for Integrated Development of the Bagmati CivilizationSource checked
Official record
No upcoming meeting is recorded in this brief. Check the official committee page for newer notices.
Key laws
- Motor Vehicles and Transport Management Act, 1993
Public transport, fares and vehicle safety (festival travel). - Public Procurement Act, 2063
Procurement rules; the committee directed e-GP use from 2083 Kartik 1. - Public-Private Partnership and Investment Act, 2075
PPP and Investment Board framework discussed at meeting 11. - Disaster Risk Reduction and Management Act, 2074
Disaster risk reduction and reconstruction coordination. - Electricity Act, 1992
Electricity licensing and hydropower. - Water Resources Act, 1992
Use of water resources, irrigation and river management. - Water and Sanitation Act, 2079
Drinking water and sanitation services. - Public Roads Act, 2031
Road network and right-of-way.
What does the evidence show?
- The FY 2083/84 budget estimates Rs 302.84 billion for the Ministry of Infrastructure Development (head 337); Rs 114.03 billion for the Ministry of Energy, Water Resources and Irrigation (head 308). These figures include money spent through provinces and local levels. Ministry of Financeअर्थ मन्त्रालय Annex 4 'मन्त्रालयगत व्यय अनुमान (वित्तीय व्यवस्था सहित)', rows 337, 308 (PDF pp. 58-59, Rs lakh)
- Unfinished works: the Auditor General reports that 782 projects under the infrastructure, energy and urban ministries, with contracts worth Rs 47.73 billion, remain incomplete even after extensions of up to 300%, and Rs 199.8 million in liquidated damages was not recovered on 19 contracts. Office of the Auditor Generalमहालेखा परीक्षकको कार्यालय Ch.3, items 44-45, printed p.31 (PDF p.41)
- Climate and disaster risk to hydropower is rising: the 2026 Rasuwa-Bhotekoshi flood caused energy-sector damage of Rs 134.70 billion (89.1% of it to hydropower) and an estimated annual loss of 2,520 GWh of hydropower generation, with recovery needs of Rs 390.62 billion. National Disaster Risk Reduction and Management Authorityराष्ट्रिय विपद् जोखिम न्यूनीकरण तथा व्यवस्थापन प्राधिकरण Energy sector section, Figure 18 and Tables 35-36 (PDF p.52)
- Power purchase planning needs strengthening, the Auditor General found: the Nepal Electricity Authority has 253 independent producers with 16,027 MW in the purchase-agreement process, yet actual generation fell short of plan in most months, a shortfall of about 268.8 million kWh that cost an estimated Rs 1.23 billion in extra imports. Run-of-river output goes unused in the wet season while the dry season depends on imports. Office of the Auditor Generalमहालेखा परीक्षकको कार्यालय Ch.3, item 66, printed p.37 (PDF p.47)
- Kathmandu Valley water supply is still below demand: according to the Auditor General, demand is about 514 million litres a day, but supply is only about 163 million litres in the monsoon and 284 million in winter; Melamchi diverts about 170 million litres a day against a target of 510 million, and 279,000 of a planned 354,000 taps have been connected. Office of the Auditor Generalमहालेखा परीक्षकको कार्यालय Ch.3, item 55, printed p.34 (PDF p.44)
- Urban environment challenges continue, the Auditor General reports: Bagmati water quality exceeds international limits at every tested point except Sundarijal, and the Banchare Danda landfill has overflowing leachate ponds because waste is not segregated and daily operations are not followed. Office of the Auditor Generalमहालेखा परीक्षकको कार्यालय Ch.3, items 48-49, printed p.32 (PDF p.42)
Questions to examine
- Has the Ministry of Infrastructure Development prepared the damage record and reconstruction plan for Rasuwa, Nuwakot and Dhading that the committee asked for within a month of 2083 Asoj 5?
- Is the ministry ready to run all procurement through e-GP from 2083 Kartik 1, given the reported security issues with the e-procurement system?
- What did the Investment Board report on PPP hydropower and waste projects, and what legal changes does it propose?
- How many incomplete contracts have been resolved or terminated this year, and how much in liquidated damages has been recovered?
- What is the plan to restore hydropower capacity damaged by the 2026 flood, and how will dry-season supply be met?
- What did the festival-transport subcommittee find, and how were the committee's directions on fares and overloading enforced?
Decision points
- Whether to schedule the follow-up meeting on the reconstruction plan and call the ministries and the disaster authority.
- Whether to adopt the festival-transport subcommittee's report and send directions to the bodies concerned.
- Whether to propose amendments to the Investment Board or PPP law based on the submissions received.
Preparation checklist
Tick boxes are only for your own use on this screen. Nothing is saved or sent.
How we know this
- Federal Parliament Secretariat (House of Representatives)सङ्घीय संसद् सचिवालय: प्रतिनिधि सभा नियमावली, २०८३ (House of Representatives Rules, 2083) Checked 2026-10-12
- Federal Parliament of Nepal (Federal Parliament Secretariat)सङ्घीय संसद्: पूर्वाधार विकास समिति — digital parliament portal committee page Checked 2026-10-12
- Federal Parliament of Nepal (Federal Parliament Secretariat)सङ्घीय संसद्: पूर्वाधार विकास समिति - बैठक १४ (१२ आश्विन २०८३) Checked 2026-10-12
- Federal Parliament of Nepal (Federal Parliament Secretariat)सङ्घीय संसद्: पूर्वाधार विकास समिति - बैठक १३ (५ आश्विन २०८३) Checked 2026-10-12
- Federal Parliament of Nepal (Federal Parliament Secretariat)सङ्घीय संसद्: पूर्वाधार विकास समिति - बैठक १२ (१८ भाद्र २०८३) Checked 2026-10-12
- Federal Parliament of Nepal (Federal Parliament Secretariat)सङ्घीय संसद्: पूर्वाधार विकास समिति - बैठक ११ (८ भाद्र २०८३) Checked 2026-10-12
- Federal Parliament of Nepal (Federal Parliament Secretariat)सङ्घीय संसद्: पूर्वाधार विकास समिति - बैठक १० (४ भाद्र २०८३) Checked 2026-10-12
- Ministry of Finance, Government of Nepalअर्थ मन्त्रालय: आर्थिक वर्ष २०८३/८४ को बजेट वक्तव्य (Budget Statement FY 2083/84) with annexes Checked 2026-10-11
- Office of the Auditor General, Nepalमहालेखा परीक्षकको कार्यालय: महालेखापरीक्षकको तिरसट्ठिऔँ वार्षिक प्रतिवेदन, सारांश, २०८३ (The Auditor General's Sixty-Third Annual Report Summary) Checked 2026-10-11
- National Disaster Risk Reduction and Management Authorityराष्ट्रिय विपद् जोखिम न्यूनीकरण तथा व्यवस्थापन प्राधिकरण: Rasuwa-Bhotekoshi Flood 2026: Rapid Damage and Needs Assessment (RDNA) Checked 2026-10-11
- Federal Parliament of Nepal (Federal Parliament Secretariat)सङ्घीय संसद्: समितिहरू / Committees (digital parliament portal index) Checked 2026-10-12
- Federal Parliament of Nepal (Federal Parliament Secretariat)सङ्घीय संसद्: पूर्वाधार विकास समिति - बैठक १४ (१२ आश्विन २०८३) Checked 2026-10-26
- Federal Parliament of Nepal (Federal Parliament Secretariat)सङ्घीय संसद्: पूर्वाधार विकास समिति - बैठक १३ (५ आश्विन २०८३) Checked 2026-10-26
- Federal Parliament of Nepal (Federal Parliament Secretariat)सङ्घीय संसद्: पूर्वाधार विकास समिति - बैठक १२ (१८ भाद्र २०८३) Checked 2026-10-26
- Federal Parliament of Nepal (Federal Parliament Secretariat)सङ्घीय संसद्: पूर्वाधार विकास समिति - बैठक ११ (८ भाद्र २०८३) Checked 2026-10-26
- Federal Parliament of Nepal (Federal Parliament Secretariat)सङ्घीय संसद्: पूर्वाधार विकास समिति - बैठक १० (४ भाद्र २०८३) Checked 2026-10-26
- Federal Parliament of Nepal (Federal Parliament Secretariat)सङ्घीय संसद्: Committee page: meetings list, first page Checked 2026-10-26
Every statement on this page links to the source above. We do not invent or estimate facts: official records lead for official acts, other sources are named for what they are, and where a record is missing or unclear, we say so. Our approach
Practical tool Preparing for a parliamentary committee
