- Type
- Regulation
- Year
- २०७४ BS
- Status
- In force
- Category
- खण्ड १०: सूचना तथा सञ्चार · Volume 10: Information and Communication
- Made under
- Telecommunications Act, 2053 (1997)
- Official text
- Official page Official text (PDF)
Analysis drawn from official reports, court rulings and published research, each cited. Figures are being double-checked against the source documents; corrections are welcome.
What does it do?
- No one may build or run telecommunication infrastructure (towers, fibre, shelters, power supply and similar non-electronic facilities) without a licence from the Telecommunications Authority, which invites applications through an English-language notice in a national daily open for at least 35 days. Anyone with more than 1 percent direct or indirect investment in a telecom service provider cannot apply, and a foreign applicant needs at least 20 percent Nepali investment. Schedule 2 requires profits in the last three years, Rs 10 billion minimum capital and experience building 5,000 towers.प्राधिकरणबाट अनुमतिपत्र नलिई कसैले पनि दूरसञ्चार पूर्वाधार (टावर, अप्टिकल फाइबर, बिटिएस सेल्टर, ऊर्जा आपूर्ति जस्ता अविद्युतीय पूर्वाधार तथा सुविधा) निर्माण तथा सञ्चालन गर्न हुँदैन। प्राधिकरणले कम्तीमा पैँतीस दिनको अवधि तोकी राष्ट्रिय दैनिकमा अङ्ग्रेजी भाषामा सूचना प्रकाशन गरी आवेदन माग्छ। सेवा प्रदायकमा प्रत्यक्ष वा अप्रत्यक्ष रूपमा एक प्रतिशतभन्दा बढी लगानी भएको व्यक्ति निवेदन दिन योग्य हुँदैन। विदेशी निवेदकको कुल लगानीको कम्तीमा बीस प्रतिशत नेपाली नागरिकको हुनुपर्छ। अनुसूची-२ अनुसार पछिल्ला तीन वर्ष नाफामा रहेको, न्यूनतम पूँजी दश अर्ब रुपैयाँ भएको र कम्तीमा पाँच हजार टावर निर्माण गरेको अनुभव लगायतका योग्यता पनि चाहिन्छ। Nepal Law Commission Rules 2(ङ), 3(1), 4(1)-(3), 5(1)-(2) and Schedule 2, PDF pp. 1-3, 15
- The licence fee is Rs 75 million and renewal costs Rs 50 million. Two licences are issued at first, with no more for five years unless service falls short or more is needed. A licence lasts no more than five years at a time and 25 years in total; renewal must be sought three months before expiry. A licensee must build or acquire at least 200 towers within two years, repair breakdowns free of charge, and get Authority approval to sell 20 percent or more of its shares.अनुमतिपत्र दस्तुर सात करोड पचास लाख रुपैयाँ र नवीकरण दस्तुर पाँच करोड रुपैयाँ छ। पहिलो पटक दुईवटा अनुमतिपत्र दिइन्छ र त्यसपछि पाँच वर्षसम्म अर्को अनुमतिपत्र दिइँदैन, तर सेवा उपलब्ध नभएमा वा थप आवश्यकता देखिएमा थप अनुमति दिन सकिन्छ। अनुमतिको कुल अवधि बढीमा पच्चीस वर्ष हुन्छ, तर एक पटकमा पाँच वर्षभन्दा बढीको दिइँदैन; नवीकरणका लागि अवधि सकिनुभन्दा तीन महिनाअगावै निवेदन दिनुपर्छ। अनुमतिपत्र प्राप्त व्यक्तिले दुई वर्षभित्र कम्तीमा दुई सयवटा टावर निर्माण वा प्राप्त गर्नुपर्छ, पूर्वाधार बिग्रिएमा निःशुल्क मर्मत गर्नुपर्छ र बीस प्रतिशत वा सोभन्दा बढी सेयर बिक्री गर्न प्राधिकरणको स्वीकृति लिनुपर्छ। Nepal Law Commission Rules 7(ख), (छ), 8(1)-(4), 9 and 10(1)-(3), PDF pp. 3-5
- Large infrastructure (towers over seven metres and backbone optical fibre) needs Authority approval, given within 30 days. No new structure is approved where shareable infrastructure already exists at the site, except for lack of capacity, as an alternative or in an emergency. Approval must allow at least three service providers to share it unless that is not technically or commercially possible. Designated special places, such as archaeological sites, need prior approval, and any environmental study or other approval required by law must come first.ठूला पूर्वाधार (सात मिटरभन्दा अग्ला टावर र ब्याकबोनका रूपमा रहने अप्टिकल फाइबर) निर्माण गर्न प्राधिकरणको स्वीकृति चाहिन्छ र प्राधिकरणले तीस दिनभित्र स्वीकृति दिन्छ। प्रस्तावित स्थानमा सहप्रयोग गर्न सकिने पूर्वाधार भएमा नयाँ निर्माणको स्वीकृति दिइँदैन, तर क्षमता कमी, वैकल्पिक वा आपत्कालीन अवस्थामा दिन सकिन्छ। स्वीकृति दिँदा प्राविधिक वा व्यावसायिक दृष्टिले सम्भव नभएमा बाहेक कम्तीमा तीनवटा सेवा प्रदायकले सहप्रयोग गर्न सक्ने गरी दिनुपर्छ। पुरातात्त्विक वा प्राचीन स्मारक स्थल जस्ता तोकिएका विशेष स्थानमा निर्माण गर्नुअघि पनि स्वीकृति लिनुपर्छ र कानूनबमोजिम वातावरणीय अध्ययन वा अन्य स्वीकृति आवश्यक भए त्यो पहिले पूरा गर्नुपर्छ। Nepal Law Commission Rules 2(घ), 11(1)-(5), 12(1)-(3) and 21, PDF pp. 1, 5-6, 10
- Service providers may share infrastructure by agreement and must tell the Authority within 30 days. Owners must not discriminate between service providers; a provider treated unfairly may complain, and the Authority must give an order within 35 days. The price is agreed between the parties; if they cannot agree, the Authority sets a reasonable price, which is final. Active equipment (base stations, antennas, spectrum and similar electronic equipment) may not be shared unless the Ministry allows it by notice, and shared infrastructure may not be re-shared.सेवा प्रदायकले सम्झौता गरी दूरसञ्चार पूर्वाधारको सहप्रयोग गर्न सक्छ र सम्झौता भएको तीस दिनभित्र प्राधिकरणलाई जानकारी दिनुपर्छ। सहप्रयोग गर्न दिँदा सेवा प्रदायकबीच भेदभाव गर्न हुँदैन; भेदभावमा परेको सेवा प्रदायकले प्राधिकरणमा निवेदन दिन सक्छ र प्राधिकरणले पैँतीस दिनभित्र आदेश दिनुपर्छ। सहप्रयोगको मूल्य पक्षहरूको आपसी सहमतिबाट तय हुन्छ; सहमति नभए प्राधिकरणले मनासिब मूल्य निर्धारण गर्छ र त्यो अन्तिम हुन्छ। मन्त्रालयले सूचना प्रकाशन गरी अनुमति नदिएसम्म बीटीएस, एन्टेना, रेडियो स्पेक्ट्रम जस्ता सक्रिय पूर्वाधारको सहप्रयोग गर्न पाइँदैन र सहप्रयोगमा लिएको पूर्वाधार अर्कोलाई पुनः सहप्रयोग गर्न दिन पाइँदैन। Nepal Law Commission Rules 16(1)-(6), 17(1)-(2), 18(1)-(4) and 20, PDF pp. 8-9
- A licensee must publish details of infrastructure it builds on its website within 30 days and inform the Authority. Licensees and existing service providers that own infrastructure must make arrangements to keep it running during disasters and report them to the Authority. Within three months after each fiscal year they must submit an audited report of their infrastructure services and income and expenditure.अनुमतिपत्र प्राप्त व्यक्तिले निर्माण गरेको पूर्वाधारको विवरण निर्माण भएको तीस दिनभित्र आफ्नो वेबसाइटमा राखी सार्वजनिक गर्नुपर्छ र प्राधिकरणलाई जानकारी दिनुपर्छ। अनुमतिपत्र प्राप्त व्यक्ति र पूर्वाधार भएका सेवा प्रदायकले विपद्को अवस्थामा पनि सेवा निरन्तर हुने व्यवस्था गरी प्राधिकरणलाई जानकारी दिनुपर्छ। प्रत्येक आर्थिक वर्ष समाप्त भएको तीन महिनाभित्र पूर्वाधार सेवा र आय व्ययको विवरण मान्यताप्राप्त लेखापरीक्षकबाट लेखापरीक्षण गराई प्राधिकरणमा पेस गर्नुपर्छ। Nepal Law Commission Rules 14(1), 23(1)-(2) and 25, PDF pp. 7, 10-11
Gaps, loopholes and improvement ideas
None documented in the official reports we have reviewed so far.
Where does it conflict with other laws?
No conflict with another law is documented in the sources we have reviewed so far.