Regulation

Building Regulation, 2066

All laws Regulations

Type
Regulation
Year
२०६६ BS
Status
In force
Category
खण्ड ११: सडक, खानेपानी, भवन पूर्वाधार · Volume 11: Road, Drinking Water, Building Intrastructure
Made under
Building Act, 2055
Official text
Official page Official text (PDF)
English translation
Official English translation archived copy: the original page is no longer online
Translations may not include later amendments. The Nepali text is the authoritative law.

Analysis drawn from official reports, court rulings and published research, each cited. Figures are being double-checked against the source documents; corrections are welcome.

What does it do?

  • Anyone (a person, organisation or government body) who wants to build a class A, B or C building must apply to the municipality for map approval on the Schedule 1 form and submit the design as well.‘क’, ‘ख’ वा ‘ग’ वर्गको भवन निर्माण गर्न चाहने व्यक्ति, संस्था वा सरकारी निकायले नक्सा स्वीकृतिका लागि अनुसूची–१ को ढाँचामा नगरपालिकामा दरखास्त दिँदा डिजाइन पनि पेस गर्नुपर्छ। Nepal Law Commission Rule 3(1), PDF p. 1
  • In village development committees where the Building Act applies, the applicant must apply to the district Urban Development Office: with the map and design for a class A or B building, and with the map for a class C building. The office may ask for more documents and, if the application is in order, must approve the map or design with conditions within 30 days of the application.भवन ऐन लागू भएका गाउँ विकास समितिमा ‘क’ वा ‘ख’ वर्गको भवनका लागि नक्सा र डिजाइन, र ‘ग’ वर्गको भवनका लागि नक्सा तयार गरी सम्बन्धित जिल्लाको शहरी विकास कार्यालयमा दरखास्त दिनुपर्छ। कार्यालयले थप कागजात माग्न सक्छ र व्यहोरा मनासिब देखेमा पालना गर्नुपर्ने शर्त तोकी दरखास्त परेको तीस दिनभित्र नक्सा वा डिजाइन स्वीकृत गर्नुपर्छ। Nepal Law Commission Rules 2(ख) and 3(2)-(4), PDF pp. 1-2
  • The application must include architectural and structural drawings (sanitary and electrical drawings for class A and B only), the cadastral map, the contract with the technician or consultant, and technical detail forms on how the design meets the National Building Code, signed with an affidavit of compliance. Drawings must be at 1:100, details no smaller than 1:50, and the site plan at 1:100 up to one ropani or 1:200 above.दरखास्तसाथ आर्किटेक्चरल र संरचनात्मक नक्सा (‘क’ र ‘ख’ वर्गका लागि मात्र स्यानिटरी र विद्युतीय नक्सा), कित्ता नापी नक्सा, प्राविधिक वा परामर्शदातासँगको करारनामा र डिजाइन राष्ट्रिय भवन संहिताअनुसार भएको खुलाउने प्राविधिक विवरण फाराम संहिता पालनाको शपथसहित पेस गर्नुपर्छ। नक्सा १:१०० को, विवरण १:५० भन्दा सानो नहुने र साइट प्लान एक रोपनीसम्म १:१०० तथा सोभन्दा माथि १:२०० को हुनुपर्छ। Nepal Law Commission Schedule 1 and notes, Technical Detail Forms 1-2, PDF pp. 3-23
  • Expert members the government appoints to the Building Construction System Improvement Committee must hold a master's degree in architecture or civil engineering with at least ten years' experience in class A or B building work, or a bachelor's degree with at least fifteen years. Copies of the Building Code are sold by the Urban Development Office for Rs 700 per hard-copy set or Rs 150 per CD.नेपाल सरकारले भवन निर्माण प्रणाली सुधार समितिमा मनोनयन गर्ने विशेषज्ञ सदस्य आर्किटेक्चर वा सिभिल इन्जिनियरिङमा कम्तीमा स्नातकोत्तर गरी ‘क’ वा ‘ख’ वर्गको भवन निर्माणसम्बन्धी काममा कम्तीमा दश वर्ष, वा स्नातक गरी कम्तीमा पन्ध्र वर्षको अनुभव भएको हुनुपर्छ। भवन संहिताको प्रतिलिपि शहरी विकास कार्यालयबाट कडा प्रति सेटको सात सय रुपैयाँ र डिजिटल प्रति सीडीको एक सय पचास रुपैयाँ तिरी पाउन सकिन्छ। Nepal Law Commission Rules 4-5, Schedule 2, PDF pp. 2, 24

Gaps, loopholes and improvement ideas

None documented in the official reports we have reviewed so far.

Where does it conflict with other laws?

No conflict with another law is documented in the sources we have reviewed so far.

Spotted an error, a loophole or a better source? Email feedback@policynepal.org. Please include the official source. We read every message but cannot promise a reply.